ROSSI POOL RENOVATION

Provided HVAC and plumbing system installation for the Rossi Pool Renovation, a major upgrade to a public aquatic facility. The HVAC scope included the installation of PoolPak dehumidification units, fabric duct systems (DuctSox), and digital control integration for automated system management. Plumbing work included water supply, drainage, and pool-related piping. The project was designed to enhance indoor air quality, improve energy efficiency, and meet Title 24 and California Energy Code requirements.


Location
San Francisco, CA

General Contractor
Roebuck Construction, Inc.

Size
Public pool facility renovation

Completion Date
November 2, 2020