Liberty High School Stadium Improvements

Provided HVAC system installation for the Liberty High School Stadium Improvements project. The scope included the installation of complete heating, ventilation, and air conditioning systems per mechanical plans. Ducted and ductless split system heat pumps were integrated for efficient climate control, while ceiling-mounted and inline exhaust fans were installed for the concession stands, locker rooms, and restrooms. Refrigerant piping and condensate drainage were fully integrated to ensure optimal performance, and fire and smoke dampers were installed for enhanced safety compliance. Final test and balance procedures were conducted to verify proper airflow and ventilation throughout the facility.


Location
Brentwood, CA

General Contractor
S.W. Allen Construction, Inc.

Size
Stadium facility including bleachers,
concessions, and locker rooms

Completion Date
January 2025